Queensland civil and subdivision walls are selected from height, surcharge, drainage, and the face the asset owner will live with. A bridge abutment or a heavily loaded embankment is an RSS conversation. A business-park boundary with a planted concrete face is often crib. A subdivision batter or a shopping-centre access ramp is often segmental block with geogrid. A creek or a slope that needs to drain is often gabion or stone pitching.
Fencepac designs to AS4678, and to TMR where the wall sits on a road corridor. RSS walls use precast concrete face panels and steel strip or geogrid reinforcement. The RSS page is the system note. This page is the selection note for the rest of the range.
Early budget rates and preliminary sections are available for tender. Full delivery runs through design, construction with Fencepac crews, and certification. The retaining hub lists every system.