Noise Walls/TMR

Transport and Main Roads

TMR Noise Walls for Queensland

Fencepac is a TMR Level 2 registered noise barrier constructor and a registered product supplier for Transport and Main Roads Queensland. Principal contractors engage one family-owned team — ISO certified, manufacturing Noise Wall panels at Wacol — to consult, design, install, and certify on Queensland and South East Queensland corridors.

TMR Level 2 constructorRegistered product supplierWacol manufactureISO 9001 | 14001 | 45001

Constructor and supplier on the same package

Transport and Main Roads registers noise barrier constructors and product suppliers separately. Fencepac holds both. For a principal contractor that means the panel, the footing interface, and the installation crew are coordinated inside one subcontract rather than across a supplier and a separate installer.

Design drawings are prepared for TMR, MRTS, and Australian Standards. Precast concrete panels are manufactured at Wacol. Installation is by Fencepac crews on live motorways and rail-adjacent corridors, with the traffic staging those sites require. Handover includes as-builts and acoustic compliance documentation.

The Noise Walls hub covers the full product range. This page is the TMR delivery note: registration, process, panel choice, and the published Queensland corridor packages.

Textured concrete Noise Walls along the Palm Beach to Tugun corridor

Consult, design, manufacture, install, certify

The same five-step delivery used on the Noise Walls hub, written for TMR packages.

  1. 01

    Consult

    Work with the principal's engineers, project managers, and acoustic consultants on the site, the specification, and the program before the package is locked.

  2. 02

    Design

    Structural engineering, acoustic modelling, and aesthetic design in-house, with construction drawings prepared for TMR, MRTS, and Australian Standards.

  3. 03

    Manufacture

    Precast concrete panels produced at the Wacol facility in Brisbane, so quality, lead time, and design changes stay with one team.

  4. 04

    Install

    Fencepac crews, plant, and supervisors on live roads and rail corridors, including traffic management and staged access.

  5. 05

    Certify

    Completion documentation, as-built drawings, acoustic compliance verification, and handover. The package is finished when it is certified.

Prequalification and estimating

Yes. Fencepac is a Level 2 registered noise barrier constructor and a registered product supplier with Transport and Main Roads Queensland. The registration covers both construction and product supply. Precast panels are manufactured at the Wacol facility in Brisbane.

Yes. Fencepac holds design, manufacture, and installation under one contract: consult with the principal's team, design to TMR, MRTS, and Australian Standards, manufacture precast panels at Wacol, install with Fencepac crews, then certify with as-builts and acoustic compliance documentation.

Concrete (precast and in-situ), absorptive, reflective, timber, transparent acrylic or polycarbonate, steel and aluminium, and RMP rotationally moulded polyethylene panels. Each type has its own page. Composite walls that mix materials — for example concrete with a transparent top — are part of the same offering.

Chainage, wall height, panel type, foundation assumptions, acoustic performance, aesthetic finish, traffic-management constraints, and whether design is included. Early budget input is available before the specification is frozen. Call estimating on (07) 5456 2444 or use the quote form and select Noise Walls.

Coomera North (Stage 1) for the Acciona Georgiou Joint Venture — design, supply, and construction, completed 14 December 2025, published value $34,314,000. Palm Beach to Tugun for the PB2T Alliance head contractor — full lifecycle delivery to TMR specifications, published value $9,607,800. Edmonton to Gordonvale on the Bruce Highway for HSA Group, published value $1,254,656. Project hours, where a case study records them, belong to that job.

QBCC Licence 1125039, ISO 9001, ISO 14001, and ISO 45001, TMR Level 2 constructor and registered product supplier status, 100+ staff, and $500M+ in delivered project value. Company participation totals used for government prequalification are 30,000+ apprentice hours and 20,000+ Indigenous participation hours. Individual case studies publish project-level hours only — those figures are not the company total.

Need a TMR Noise Walls price?

Send chainage, heights, panel type, and whether design is included. Estimating will price the constructor and supplier scope together.